The wind power generation facilities that are positioned at the core of the town revitalization will be expanded. The town has formulated a new energy introduction plan and plans to cover all electricity demand in the town by wind power by around 2005. There are already two 100 kilowatt-class, 400-kilowatt-class, two 600-kilowatt-class units, and the "Tachikawa Wind Power Research Institute", which also has a stake in the town, is working on the second wind turbine generator in Denmark, in spring 2000. It will sell to Tohoku Electric power.
https://www.eco-power.co.jp/en/
No comments:
Post a Comment